Solar Water Pumping Scheme (PM-KUSUM Component)
Haryana Renewable Energy Development Agency (HAREDA), Government of Haryana
Why it matters
Farmers without an electricity connection for irrigation can get a solar-powered water pump installed for just a quarter of the cost, cutting both diesel and electricity expenses.
Valid until
Ongoing
Benefit type
Subsidy
Created by
Government of Haryana
What you get
Under the PM-KUSUM-linked Solar Water Pumping Scheme implemented by HAREDA, eligible Haryana farmers can install solar pumps ranging from 3 HP to 10 HP capacity at a total subsidy of 75% — 30% central financial assistance and 45% state subsidy — paying only the remaining 25% of the cost themselves. The scheme particularly benefits farmers in areas without an electricity connection for agricultural use, replacing costly diesel pump-sets with a clean, low-running-cost solar alternative for irrigation.
Eligibility criteria
- Must be a Haryana resident farmer with a valid Parivar Pehchan Patra (PPP)
- Agricultural land must be registered in the applicant's name
- Applicant should generally not already have an electric agricultural connection in their name
- Pump capacity sought must be within the 3 HP to 10 HP notified range
How to apply
- 1
Apply online through the HAREDA solar pump portal or the Antyodaya Saral portal
- 2
Submit land and Parivar Pehchan Patra details for eligibility verification
- 3
On approval, pay your 25% farmer-share cost to the empanelled solar pump vendor
- 4
Vendor installs the solar pump set after subsidy disbursal/adjustment is processed
Documents required
- Aadhaar card
- Parivar Pehchan Patra (PPP)
- Land ownership record
- Bank passbook
AgriBoz is a private platform. We are not a government entity and are not affiliated with, endorsed by, or authorised by any government department. Scheme information here is compiled for awareness only and can change — always verify it on the official government source linked with each scheme, and apply through the official portal. We do not guarantee scheme approval or benefits. See the complete list of official government sources.
